Project · Pegram, TN
New Office Building Pad, Wall & Bollards – Austin Powder, Pegram TN
Short answer: TriStar poured a new 2,160 SF concrete slab on grade, a 54 LF concrete wall, and set 15 steel pipe bollards for a new site office building pad at Austin Powder's facility near Pegram, TN.
- Location: Pegram, TN
- Customer: Austin Powder
- Project Type: Foundation / footing / wall
- Scope: 8" x 2,160 SF concrete slab on grade, a 6" x 4' concrete wall (54 LF), and (15) 6" steel pipe bollards for a new site office building pad
- Size: 2,160 SF slab, 54 LF wall, 15 bollards
- Specs: #4 rebar at 12" O.C. each way in the slab, #4 rebar at 16" O.C. in the wall, 6" compacted aggregate base, pump-placed concrete
The challenge
Austin Powder needed a new office building pad built inside an active industrial site near Pegram, TN. That meant coordinating around ongoing plant operations, working through a rush lead time on rebar, and getting a slab, a concrete wall, and a full row of protective bollards poured without slowing down daily site traffic.
What we did
TriStar graded the pad area and placed a compacted aggregate base, then set #4 rebar on chairs for both the slab and a 4-foot concrete wall along one edge. We formed and pump-placed the 8-inch, 2,160-square-foot slab on grade, built and poured the 54-linear-foot wall, and set 15 steel pipe bollards around the pad to protect it from vehicle traffic.
The result
A finished slab on grade ready for the new office building, a poured concrete wall, and a full row of bollards protecting the site — delivered on a working industrial site without disrupting Austin Powder's operations.
This is one of our commercial concrete jobs in Pegram. See all projects or request pricing for something similar.
Questions we get about this
How thick should a concrete slab be for an industrial building pad?
It depends on soil conditions and the loads the building will carry, but 8 inches is a common thickness for slabs supporting light-to-moderate commercial or office structures. This pad's 8-inch slab with #4 rebar on 12-inch centers was sized to the project specs for a new site office building.
Why use steel pipe bollards around a concrete pad?
Steel pipe bollards set in concrete protect a slab, wall, or building from vehicle impact — especially useful on an active industrial site with regular truck and equipment traffic. They're a permanent, low-maintenance barrier compared to painted curbs or wheel stops alone.
Need an estimate?