Bojangles Harding Place Remodel – Nashville, TN

Short answer: TriStar handled the concrete scope for a restaurant-to-Bojangles remodel off Harding Place: interior trench pourback for a plumbing reroute, drive-through demo and repave, and new menu board footings.

  • Location: Nashville, TN
  • Project Type: Tenant finish / remodel / pourback
  • Scope: Interior trench pourback following a plumbing reroute, removal and haul-off of the old asphalt drive-through lane with new concrete paving, and footings for two menu boards plus one bollard

The challenge

An existing restaurant building off Harding Place was being converted into a new Bojangles location. The remodel called for rerouting the interior plumbing under the floor slab, which meant cutting and reworking trenches across the building, plus a full rebuild of the old asphalt drive-through lane to bring it up to the new layout.

What we did

TriStar prepped and poured back the interior trench sections once the plumbing reroute was in, tying the new concrete in flush with the existing floor around the cleanouts and stub-ups. Outside, our crew removed and hauled off the old asphalt drive-through lane, set rebar over the compacted base, and pumped and placed new concrete paving in its place. We also installed footings for two menu boards and one bollard.

The result

The interior floor is patched and flush for the trades following behind, and the drive-through has new concrete paving in place of the old asphalt, with the menu board footings and bollard installed.

This is one of our tenant finish concrete jobs in Nashville. See all projects or request pricing for something similar.

Rebar and vapor barrier prepped across the interior trench ahead of the plumbing-reroute pourback

Photos

Bojangles Harding Place Remodel – Nashville, TN

Need an estimate?

Send us the plans or a few photos and an estimator will reach out within 24 hours.